Capital Deployed

$54.6 M

Number of Projects

9

Projected Utility Savings (KBTU/yr)

5.57 M

Projected emission reductions (MTCO2e/Yr)

644.42

PACE Capital Deployed
Projected CO2 Emission Reduction (MTCO2e/Yr)
Projected Energy Savings (kBTU/Yr)